Current state

 


At this point in time a newer faucet and base plate was installed to replace a leaky faucet. The previous faucet was not repairable.

The new water pump is up and running 24/7.

All siding is in place.

The solar pv station is working 24/7.

Interior and exterior painting remains to be done.


 UPDATE: I trimmed the length of the Wagner paint sprayer hose and was able to remove the clog. I have part of the hose that may be enough to use a paint bucket. I will need to drill holes in the bucket lid and attach to the bucket to prevent paint splashes.